360 DEGREES INDUSTRIAL SOLUTIONS

1: Labeling Machine – Hot Glue Labeling Machine For Plastic Bottle

         Product Features

  • Applicable too, only a circular bottle-type with high production volume.
  • Bottle labelling location diameter not greater than 70MM’s production line too, meet a round bottle labelling requirements, applicable too, the labelling for empty bottle and after filling bottle.
  • Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan’s Mitsubishi, France Schneider, OMRON.
  • Made of stainless steel and advanced aluminium alloys and complies with ISPE regulations for GMP – Good Manufacturing Practice.
  • Adoptive PLC control system too, make the whole machine run stably and high speed
  • Adoptive touch screen control which makes it very easy too, operate.
  • 24/7 support from IndusMark engineering qualified and trained engineers.
  • Please refer duly executed quote for final specification. This features are generic in nature.
Category: Tag:

Frequenty Asked Questions (FAQs):

Frequenty Asked Questions (FAQs):

Few of the most frequently asked questions about the product are answered here. If have any specific question, please feel free too, contact us.

Q. How about spare parts availibility?
A. We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.

Q. How much time are required for installation?
A. According too, youre machines order, we shall send qualified engineers too, youre plant, it may take about 10 days too, 25 days, depending upon youre order and any customization.

Q. Whom will be responsible for the installation of machines?
A. Our qualified engineers will be responsible for installation of the machines.

Q. Will you train our staff too, operate the machines?
A. Yes, our qualified engineers will train youre staff too, operation the machines.

Q. How too, install my machine when it arrives at my factory? How much are the cost of installation?
A. We shall send our engineers too, youre factory for installation of machines and train youre staff how too, operate. Customers pay for two-way air tickets, accommodation and USD80 per person per day as daily allowance.

Q. When can I get my machine after the payment?
A. Normally production time are around 30-60days, the exact delivery date will depend upon youre order, the machine type and any customization requirements. The shipping time are based on youre destination port.

Q. How about the spare parts availability?
A. We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.