Skip to product information
1 of 1

IndusMark Engieenring

4: 1000L/H Single Stage RO Mobile Water Treatment Machine, Reverse Osmosis System Water Treatment Plant

4: 1000L/H Single Stage RO Mobile Water Treatment Machine, Reverse Osmosis System Water Treatment Plant

Contact Us IndusMark Export Now

Order On WhatsApp

Reverse osmosis water treatment machine

Reverse osmosis (RO) is a kind of membrane separation process driven by pressure gradient. It can effectively remove dissolved salt colloids and organic matters in water like molecular filter. The reverse osmosis process is the reverse process of natural osmosis. In order to produce reverse osmosis process, it is necessary to use water pump to exert pressure on saline solution to overcome its natural osmotic pressure, so as to make water pass through the reverse osmosis membrane; At the same time, in order-to prevent salt impurities in raw water from focusing on the membrane surface, concentrated water should continuously wash the membrane surface during operation, and take the impurities from the concentrated water and membrane surface to realize the whole process of reverse osmosis desalination and purification.

View full details

Frequenty Asked Questions (FAQs):

Frequenty Asked Questions (FAQs):

Few of the most frequently asked questions about the product are answered here. If have any specific question, please feel free to contact us.

Q. How about spare parts availibility?
A. We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.

Q. How much time is required for installation?
A. According to your machines order, we shall send qualified engineers to your plant, it may take about 10 days to 25 days, depending upon your order and any customization.

Q. Who will be responsible for the installation of machines?
A. Our qualified engineers will be responsible for installation of the machines.

Q. Will you train our staff to operate the machines?
A. Yes, our qualified engineers will train your staff to operation the machines.

Q. How to install my machine when it arrives at my factory? How much is the cost of installation?
A. We shall send our engineers to your factory for installation of machines and train your staff how to operate. Customers pay for two-way air tickets, accommodation and USD80 per person per day as daily allowance.

Q. When can I get my machine after the payment?
A. Normally production time is around 30-60days, the exact delivery date will depend upon your order, the machine type and any customization requirements. The shipping time is based on your destination port.

Q. How about the spare parts availability?
A. We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.